Driveway De-icing
- For driveways and car parks
Heat Mat’s Scandinavian designed ice & snow melting systems can be used beneath virtually any surface to ensure it remains free from dangerous ice and snow build up.
The robust heating wire systems are suitable to protect driveways, car parks, pathways, steps, loading ramps and bridges and when used in conjunction with intelligent thermostats they provide an energy efficient and fully automated heating system.
Custom made ice and snow melting thermostats monitor both the ground temperature and the moisture level to ensure that they only operate when they are really needed. The thermostats are fully programmable and can be set up for the specific local conditions as required.
In addition to ensuring that driveways and walkways remain free of dangerous ice and snow buildup the heating systems also prevent the need to use salt to keep areas clear, minimising costs and also ensuring both the road surface and the surrounding environment are not damaged or contaminated by salt buildup.
Why install a Heat Mat driveway de-icing system?
- Improved safety for vehicles and pedestrians as surfaces are automatically safe to drive and walk on
- Automated clearance of ice and snow, ensuring that Health and Safety requirements can be met and that the first person on site does not have to make the area safe
- Surfaces (particularly concrete) are not damaged by grit and salt, and are also protected from the normal freeze/thaw activity in winter
- The surrounding ground and waterways are protected from salt pollution
- A number of different sensors and timers can be combined to ensure that the system only operates when it is required, minimising energy usage
- Entirely maintenance free. Once the system is installed there is no requirement for any maintenance work and some systems include an automatic alarm warning if the system fails for whatever reason
- A tried and trusted system. These systems have been used in Scandinavia for more than a decade and have proved their worth in extreme temperatures and weather conditions
Accessories
Tech Spec
PKC-7.0-XXXX
In-screed and outdoor heating cable
| Supply Voltage | 230V+/-10% |
|---|---|
| Power output | 170W-270W/sqm |
| Maximum load | 21W per meter |
| Output Range | 210W - 3067W |
| Standard Range | 10.5m - 150.0m |
| Coldtail lead | 2m double insulated cable |
| Wire thickness | 6.8-7.2mm |
| Cable flexibility | Minimum radius 50mm |
| IP Rating | IPX7 |
| Inner insulation | 0.8mm silicon rubber |
| Outer insulation | Robust PVC UV resistant |
| Earth protection | 100% aluminium earth shield |
| Cable reinforcement | Fibreglass strands |
| Fixing materials | Heat Fix metal fixing bands |
| Compliant with | Part L, 17th Edition IEE Wiring Regulations, EN 60335-1:1998, EN60335-2-17:1999, IEC 60730 |
FRO-47A-STAT – 10.8kW Thermostat
| Supply voltage | 120/230V ±10%, 50-60 Hz |
|---|---|
| Temperature range | 0/+5°C |
| Working range | -20/+5°C |
| Built-in timer snow melting/afterrun | 1-6 hours |
| Output relay | 3 x 16A potential free relay |
| 2 zone application | Output is 2 x 16A potential free relay |
| Water based system | Controlling a 3 or 4 way valve, primary pump, secondary pump |
| Display | Graphic and with backlight |
| Ambient operating temp | 0/+50°C |
| Housing / incl. cover | IP20 |
| Weight | 495 g |
| Mounting | DIN-rail mount |
| Dimensions | (H/W/D) 170/162/45 mm |
| LED’s indicate the functions: | |
| On/Green | Supply Voltage to the thermostat |
| Alarm/Red | Fault indication |
FRO-GRO-SENS
Ground temperature and moisture sensor
| Senses | Moisture and temperature |
|---|---|
| Mounting | Outdoor area |
| Housing | IP68 |
| Operating temperature | -20/+70°C |
| Dimensions | H32, Ø60 mm |
Choice of output
For normal installations we recommend an output of around 270W/sqm which provides a good balance between speed of operation and power requirements. Often the limiting factor to the size of area which can be heated is the available power supply on site, and with restricted power supplies it is often possible to specify a lower powered system which will still clear the ice and snow.
Tyre track heating
Where a long driveway requires heating it is quite acceptable to simply heat two tyre tracks leaving other areas unheated. This saves on the power requirements and installation and running costs and it allows longer driveways to be heated than would otherwise be possible.
Drainage channel heating
When heating a driveway or path area it is vital to ensure that the water can safely run away, and does not become pooled to then refreeze. When heating a driveway area we recommend that trace heating cables are installed into the drainage channels to ensure complete clearance.
Installation methods
There are a number of different installation methods, although all of them involve fixing down outdoor heating cable to Heat Fix metal bands or zip-tying it onto reinforcement mesh. A rough overview of the three most popular installation methods is detailed below; please contact Heat Mat technical support for more details.
Asphalt
The main issue to consider when installing heating cables beneath asphalt is to ensure that the heating cables do not come into contact with hot asphalt. The normal method of installation would be to level the current surface. If the surface is concrete or similar Heat Fix strips can be nail-gunned to the base and the cable installed onto these. If the surface is not concrete or similar a layer of 30mm of sand or finely crushed stone should be laid with a wire mesh placed on top of this, and the cables zip-tied in place. A minimum of a 10mm layer of sand should then be laid on top of the cables. The asphalt should be allowed to cool to approximately 100oC, before laying it over the sand, to ensure the cables are not damaged. The asphalt layer should be at least 55mm thick.
Block paving
Care must be taken not to drop any paving slabs onto the cable during the installation process as these could damage the heating system. The normal method of installation would be to level the current surface and lay a 60mm layer of sand/grit and compact this as required. A wire mesh would then be laid on top of this layer and the heating cables would be zip-tied in place. A further 40-50mm layer of sand/grit would then be laid on top and this would be compacted by hand to ensure no damage to the heating cables. The block paving could then be laid, and to achieve the greatest benefit from the heating system the blocks should be between 50 and 80mm thick.
Concrete
Heating cables are often installed into concrete bases as concrete is particularly prone to damage from rock salt and freeze/thaw activity. The standard installation method would be to level the existing base before covering it with a support layer of sand/grit 30-40mm deep. A reinforcement mesh should then be laid and the cables can be zip-tied in place on this, before placing a layer of sand on top to protect the cables; this should be a minimum of 10mm thick. The concrete can now be poured and it should form a layer with a minimum depth of 50mm, and the concrete mix must not include sharp stones as these could damage the cables.